Monday, October 10, 2005

KPIs for Project Management

Here are something to read about PM KPI: KPI explained

When we want to create KPIs for PM, we need to use the CSC (Critical Success Criteria) related to project management. This means that the KPIs must be related to Time, Budget and Scope (TBQ) tripple constraints.

In order to relate to these three critical criteria, the assumption is that tasks contribute to scope. Each task involve resource. Each resource is related to cost. Each task needs time for completion. Therefore Earned Value Analysis or Management is the tool that we usually used to measure these three key performance areas.

The following are some sample of KPIs related to Project Management (or Earned Value elements):

Earned Value (EV) -- This is the value that we get back as a result of the investment. For example, after the contract is signed, nothing is done but the vendor is paid 10% of the project fee; so, the earned value is still $0. Unless some work already performed and can be translated to the value.

Schedule Variance (SV) -- To show what is the difference between the original plan and the actual progress.

Cost Variance (CV) -- To show what is the cost difference between the original project budget and the actual expenses.

Schedule Performance Index (SPI) -- To show how well the schedule is managed against the baseline. This means that, for every $1 we spend on the resource, how much progress is achieved.

Cost Performance Index (CPI) -- To show how well the cost is managed against the original budget baseline. This means that, for every $1 we spend on the resource, how much value we got in return. For example, if we pay $1, but we get $0.5 of the value of the result, that means the CPI is poor.

Other KPIs that may be applicable are such as:

Customer Satisfaction -- For example, we can measure the return customer in quantity, or customer terminate the contract, etc.

Process Efficiency -- For example, the speed in getting one job done is compared between the post-project to the pre-project measurement.

Quality Efficiency -- For example, the number of defects, etc.

3 comments:

Unknown said...

Hi

I like this post very much. It help me to solve some my work under my director’s requirements.

Apart from that, below article also is the same meaning

key performance indicators examples

Tks again and nice keep posting
Rgs

Unknown said...

Hi Kam,

I have a question. I have a project with the following data. Hours of techs done, hours expected and % of project complete. Can I make a productivity KPI out of that data? What KPI's can I do?

Kam Yen Cheah said...

Hi Jim Richard,

I would like to clarify my understanding on your question:

You would like to group your PV, EV, AC in hours, and you want to group them by "Tech Hours" and "% of Project Complete"?

May I know what do you mean by Tech Hours? For example, in your schedule, you have tasks that are performed by Project Manager, Project Assistant, Project Secretary, System Analysts, System Engineers, Software Engineers, Software Testers, etc. Tech Hours are referring to hours rendered by System Analysts, System Engineers, Software Engineers and Software Testers? So called, hours rendered by non Management nor Administrative Resources?

Converting a Physical Linux to Virtual

Hmm ... I have done a lot of work on my Linux Lubuntu 15.10 with PHP and PostgreSQL and a few other things ... it is quite time-consuming to...